| Title/Description | Date | Size |
|---|---|---|
Technical Bulletin No. 20Previous Technical Bulletins; Updates to CAD Standards and UDACS; Coating on Appurtenances in Vaults; Inspection Results Available On-Line for Development Inspections; Scheduling Inspections; Flushing of Mains; Call Before You Dig |
05-2006 | 186.81k |
Technical Bulletin No. 19Placement of Grout in Casings; Placement of Locator Balls on Water Facilities; Vault Construction; GPS Data Collection; Use of Native Soil Material for Pipe Backfill; Valve Box Cover Requirements |
08-2004 | 70.37k |
Technical Bulletin No. 18Developer Agreement Time Limits; Avoid sexual harassment |
06-2001 | 13.25k |
Technical Bulletin No. 17Uniform Design and Construction Standards in Spanish; Inspection process feedback requested; Compact Backflow Assembly–Proposed Detail Drawing |
02-2001 | 37.26k |
Technical Bulletin No. 16Turning Water Mains Back on After Shutdown; Use of Native Soil Material for Pipe Backfill; Internet Construction Assistance; District GPS Base Station and Data Available for Public Use |
02-2000 | 24.73k |
Technical Bulletin No. 15Water Service During Phased Construction; Water Plan Review Acceptance Form; Angle Meter Stops; Hydraulic Analysis; Water Plan Submittals with CAD Files; Installation of Pressure Reducing Valves |
09-1996 | 23.18k |
Technical Bulletin No. 14Services in Driveways; Water Service During Phased Construction |
05-1995 | 12.22k |
Technical Bulletin No. 13Revised Service Rules; Effectiveness Assessment; Service Removals; 1-inch Diameter Service Laterals |
12-1994 | 69.10k |
Technical Bulletin No. 12Scheduling Inspection Services; Painting Large Meters and Check Valves; Pressure Losses at Large Services |
07-1994 | 22.27k |
Technical Bulletin No. 11Backflow prevention requirements upgraded; Water Service During Phased Construction; 3" to 10" Diameter Backflow Assemblies and Double Detector Checks; Disadvantaged Business Enterprise Encouragement; New Rate for Inspection and Repair Service |
03-1994 | 13.90k |
Technical Bulletin No. 10Developer Project Specifications Revised; Standard Plates Revised; Water Service Lateral Damage |
11-1993 | 14.58k |
Technical Bulletin No. 9Developer Project Specifications; Approved Materials List; Pipeline Disinfection |
05-1993 | 13.77k |
Technical Bulletin No. 8New Service Requirements; Specifications; New Product Approval; Cadmium-plating Change; Mylars for Water Plans |
09-1992 | 14.53k |
Technical Bulletin No. 7Backflow Prevention Assembly Specifications and Approved Products List; Availability of Developer Specifications; Lack of White Markings for Line Locators |
04-1992 | 13.70k |
Technical Bulletin No. 6Approved Products and Manufacturers; Precast Vault Specifications; Waterline Sizing and Oversizing Procedures; New and Revised Standard Plates; Drawings requested in Cad format |
02-1992 | 13.51k |
Technical Bulletin No. 5Approved Products and Manufacturers; Standard Specifications and Plates; Revised Construction Specifications |
09-1991 | 11.75k |
Technical Bulletin No. 4Policy on Deficient Work; Field Adjustments for Fire Hydrants; New Standard Plates; Approved Products and Manufacturers; Water Commitment Regulations |
06-1991 | 154.65k |
Technical Bulletin No. 3Backflow Assemblies; Approved Products and Materials; Plans Submittals; Limits to Flushing New Water Lines; Water Service Commitment Regulations |
05-1991 | 14.80k |
Technical Bulletin No. 2Service Rules Reminder; Inspection Requests; New fire service meters approved; Contractor-caused Damage; Specifications for Sleeve-type Couplings |
02-1991 | 11.75k |
Technical Bulletin No. 1ACP Collars Unallowed; New Standard Plates; Ductile Iron Pipe Approved; Engineering Department Reorganization |
01-1991 | 12.29k |
Sign up to receive e-mail notices about engineering consulting and construction bid opportunities.
Already registered?
Log in to update your information »